General Contractors and Subs in Alabama: Run Every Job From One Shared Work Order

General contractor reviewing a work order on a tablet with subcontractors at a commercial job site

On a commercial job, a general contractor may have a framer, an electrician, a plumber, an HVAC crew and a cleanup crew all working the same week. When each of them gets instructions by text, the details split across a dozen threads, and nobody has the whole picture. The fix is simple: one shared work order per job that the GC and every sub can see.

This guide walks through how GCs and subcontractors in Alabama can run a job from vetting to final payment without losing details along the way.

Before you bring on a sub: check the paperwork

Collect and check these before a sub starts work:

  • Certificate of insurance (COI) showing general liability and workers’ compensation, with your company named as additional insured if your contract requires it.
  • Form W-9, so you can issue a 1099-NEC if you pay them $2,000 or more in 2026.
  • Licenses. In Alabama, electrical, plumbing and HVAC work generally require a state license, and general contracting on commercial projects above the state’s dollar threshold requires a license from the Alabama State Licensing Board for General Contractors. Look up license numbers on the board’s website rather than relying on a copy.
  • A signed subcontract covering scope, schedule, insurance and payment terms.

Our vendor compliance guide covers what to check on each document.

Write the scope where everyone can see it

Give each sub’s portion of the job its own work order, attached to the same project:

  • Exactly what this sub is responsible for, and what they are not
  • Drawings, specs and photos of current conditions
  • Site access, parking and working hours
  • Start date, finish date and what has to be done before they can start
  • Who on the GC’s team approves their work

For what belongs in each job record, see the shared work order guide.

During the job: keep updates on the job, not in texts

  • Status. Each sub updates their own work order: scheduled, on site, waiting on another trade, complete.
  • Photos. Before and after photos, plus anything that will be covered up, like rough-in work behind drywall.
  • Messages. Questions and answers stay attached to the job, so the next person can read the history.
  • Scope changes. Write them down and get them approved before the extra work starts. Most payment disputes start with a change that was agreed verbally.

Closeout: punch list, invoice and payment

  1. Walk the work and add punch list items to the sub’s work order.
  2. The sub closes each item with a photo.
  3. The sub invoices from the work order, so the invoice carries the scope, approved changes and photos.
  4. The GC approves and pays against that record.

For subcontractors: how to get more GC work

  • Keep your vendor packet ready: a current COI, a signed W-9 and your license numbers. GCs pick the sub they can approve today.
  • Send renewed certificates before they expire. It keeps you on the preferred list.
  • Document your work with photos. It protects you in a dispute and makes the next bid easier.
  • Answer fast. On a busy job, the sub who confirms the schedule first usually gets the next call.

How ConekPro helps GCs and subs

  • GCs create work orders and invite their subs. Each sub sees their own scope, photos and messages.
  • Subs assign their own crew and update the job from their phone, in English or Spanish.
  • Insurance certificates, W-9s and licenses live in a compliance vault next to the work.
  • Invoices are created from the work order, and payments run through secure Stripe payments.
  • When you need a new sub, you can post the job for vetted local contractors to bid on.

ConekPro was built in Birmingham by a commercial contractor with 27 years in the field. Sign up to run your next job on it, or see how it works for property managers.

Frequently asked questions

What paperwork should a GC collect from a subcontractor?

A current certificate of insurance, a signed W-9, license numbers verified with the state board, and a signed subcontract covering scope, schedule, insurance and payment.

How do you keep subcontractors on the same page?

Give each sub’s portion of the job its own work order with the scope, photos and schedule, and keep status updates, messages and changes on that work order instead of in texts.

Do subcontractors pay to use ConekPro?

Subs invited by a paying company get a free account to work on that company’s jobs. Subs who want to find other work or run their whole business on ConekPro can choose a paid plan.

Licensing rules change and vary by trade and project size. Check with the Alabama licensing board for your trade before you bid.